Project

DESIGN, CONSTRUCTION, EQUIPMENT, OPERATION AND MAINTENANCE OF THE WASTEWATER TREATMENT PLANT IN BAHIA DE BANDERAS, NAYARIT.

Sector: Water and Environment


Last Revision

March 04, 2024
Short Name of the Project:
0600 WWTP Bahia de Banderas
Type of Investment:
Brownfield
Subsector:
Water sanitation
Asset (s):
 Wastewater Treatment Plant 600 litres per second (l/s) 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

245,043,000

Estimated Investment USD:

14,329,999

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
  Design,  Construction,  Equipment,  Operation,  Maintenance

DESCRIPTION

The project consists of the construction of the Bahia de Banderas Wastewater Treatment Plant (PTAR), in Nayarit. It has a treatment capacity of 600 l/s. It will treat 100% of Bahia de Banderas waste water.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public / Private
Type of Contract
  Provision of services
Term
20 years
Selection Process
Public Bid
Financing Sources
FONADIN
35.46 %
MXN
86,892,248
USD
5,081,418
Private
64.54 %
MXN
158,150,752
USD
9,248,581
Payment Source
Project revenues / Rate
The Bahia de Banderas Operating authority pays the private developer for the services delivery.

STATUS

Stage
  Operation
Substage
  < 5 years of operation
RELEVANT DATES
Contract Signing April 01, 2011
Execution/Construction Starting Date November 2012
Term of the Contract April 02, 2031
Contractor
Equipamiento y Servicio de Agua de Bahía de Banderas  
Major Contractor’s Shareholders
Fuerza de Apoyo Constructiva de Occidente, INVEX Infraestructura 2, Ingeniería de Sistemas Sanitarios y Ambientales, Servicios Integrales de Ingeniería y Administración de Obras

GEOLOCATION

State(s)
Nayarit   

SPONSOR

Responsive image
Entity
Comisión Nacional del Agua
Department
Organismo Operador de Bahía de Banderas
Contact
Merced Venegas Parra / Director General del OROMAPAS
E-mail
direccion@oromapas.gob.mx

SUSTAINABLE INFORMATION

PROJECT’S SUSTAINABILITY SUMMARY

The Project consists of the construction of a wastewater treatment plant and sanitary sewer system in the Valle de Banderas Zone. In addition to benefiting the residents of said area with access to the water sanitation service, the Project will benefit the environment with the discharge of treated, not crude, waters into the Ameca River.

* This summary was prepared based on the methodological framework defined by the Inter-American Development Bank (IDB) in the document entitled: “Attributes and Framework for Sustainable Infrastructure”, which is You can check Here.

Additionally, a brief explanation of the methodology and a summary of the questions applied can be consulted in this Document.

ADDITIONAL INFORMATION

Responsive image
Source
Secretaría de Medio Ambiente y Recursos Naturales
Description
Federal government entity and sectorial authority responsible for establishing the necessary criteria and instruments to guarantee the protection, preservation, and use of natural resources, by developing an environmental policy that ensures sustainable growth.
ID
18NA2013HD002
Permits

Follow the Project

Leave your e-mail to receive updates on this Project.

 I have read and I accept the Privacy Notice