Project
DESIGN, CONSTRUCTION, EQUIPMENT, INSTALLATION, OPERATION AND MAINTENANCE OF A WIND POWER PLANT IN THE STATE OF TAMAULIPAS.
Sector: Electricity
Last Revision
August 05, 2024
Power Auction:
Short Name of the Project:
0587 CENACE. 1st Long Term Power Auction (SLP-1/2015) El Cortijo
Type of Investment:
Brownfield
Subsector:
Wind Power
Asset (s):
Wind Farms 183 MW
Contract Currency:
Mexican Pesos MXNEstimated Investment MXN:
4,900,000,000
Estimated Investment USD:
286,549,707
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
Design, Construction, Equipment, Installation, Operation, Maintenance