Project
DESIGN, CONSTRUCTION, EQUIPMENT, INSTALLATION, OPERATION AND MAINTENANCE OF A PHOTOVOLTAIC POWER PLANT IN THE STATE OF YUCATAN.
Sector: Electricity
Last Revision
November 04, 2024
Power Auction:
Short Name of the Project:
0584 CENACE. 1st Long Term Power Auction (SLP-1/2015) Concunul
Type of Investment:
Brownfield
Subsector:
Solar Power
Asset (s):
Solar Farm 70 MW
Contract Currency:
Mexican Pesos MXNEstimated Investment MXN:
1,430,000,000
Estimated Investment USD:
83,625,730
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
Design, Construction, Equipment, Installation, Operation, Maintenance