DESIGN, CONSTRUCTION, EQUIPMENT, INSTALLATION, OPERATION AND MAINTENANCE OF A PHOTOVOLTAIC POWER PLANT IN THE STATE OF jalisco.

Sector: Electricity


Last Revision

February 01, 2024
 
Short Name of the Project:
0583 CENACE. 1st Long Term Power Auction (SLP-1/2015) Las Viborillas
Type of Investment:
Brownfield
Subsector:
Solar Power
Asset (s):
 Solar Farm 113.72 MW 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

2,193,000,000

Estimated Investment USD:

128,245,614

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
  Design,  Construction,  Equipment,  Installation,  Operation,  Maintenance

DESCRIPTION

The project consists of the design, construction, equipment, installation, operation and maintenance of “Las Viborillas" photovoltaic power plant with a total production capacity of 100 MW in the state of Jalisco. The plant has the following features:
Power Zone: National
Export Subarea: “Occidental”
Price Area: Aguascalientes
Interconnection Zone: VAQUERÍAS MANIOBRAS VQM-230

Jinkosolar Investment, was assigned the following contract through CENACE's 2015 long-term power auction:

Contract number: SLP2015010331-01 related to:
- Energy for 277,490 MWHr/Year during 15 years and issue Renewable Energy Certificates (CEL) for 277,490 CEL/Year during 20 years, with an offered price of MXN$226,975,665

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Private
Type of Contract
  Assignment
Term
15 years
Selection Process
Public Auction
Financing Sources
Private
100 %
MXN
2,193,000,000
USD
128,245,614
Payment Source
Project revenues / Rate
Electric Coverage Contract between “Suministro Básico” (Public Service Regulatory Entity) and the generator.

STATUS

Stage
  Operation
Substage
  > 5 years of operation
RELEVANT DATES
Request for proposals/Announcement November 30, 2015
Proposals Reception January 20, 2016
Ruling March 31, 2016
Contract Signing July 12, 2016
Execution/Construction Starting Date February 01, 2018
Operation Starting Date September 28, 2018
Term of the Contract 2031
Contractor
Jinkosolar Investment  
Major Contractor’s Shareholders
Jinkosolar Investment

GEOLOCATION

State(s)
Jalisco   

Entity in charge of controlling the possession of communal land, as well as providing documentary legal security derived from the application of the Agrarian Law, and is the operator of the Geospatial Information System (SIG).

SPONSOR

Responsive image
Entity
Private
Department
Jinkosolar Investment

SUSTAINABLE INFORMATION

PROJECT’S SUSTAINABILITY SUMMARY

The project seeks to generate 277,490 MWh/Year contributing directly to the reduction of greenhouse gases, generating local jobs, and demand for local services and products that will benefit the local economy.

* This summary was prepared based on the methodological framework defined by the Inter-American Development Bank (IDB) in the document entitled: “Attributes and Framework for Sustainable Infrastructure”, which is You can check Here.

Additionally, a brief explanation of the methodology and a summary of the questions applied can be consulted in this Document.

ADDITIONAL INFORMATION

Responsive image
Source
Secretaría de Medio Ambiente y Recursos Naturales
Description
Federal government entity and sectorial authority responsible for establishing the necessary criteria and instruments to guarantee the protection, preservation, and use of natural resources, by developing an environmental policy that ensures sustainable growth.
ID
14JA2016E0071
Permits
Responsive image
Source
Centro Nacional de Control de Energía
Description
Public entity whose objective is to exercise operational control over the national electric system and the operations of the wholesale electricity market, and to guarantee impartial access to the national transmission network and to the general distribution network
Responsive image
Source
Comisión Reguladora de Energía
Description
The Energy Regulatory Commission is an independent regulatory entity that fosters the efficient growth of the sector, as well as of a reliable power supply. Its mission is to regulate the activities of the power industry in a transparent, impartial, and efficient manner, in order to generate the required certainty that encourages productive investment, promotes healthy competition, and generates an adequate coverage of services.
ID
E/1790/GEN/2016
Permit
ID
PROEMIO: E/1790/GEN/2016
Resolutions Additional information

REMARKS

Through the resolution RES/2609/2017, the power generation permit was transferred to Solar Park Viborillas, S. de R. L. de C. V.