Project

DESIGN, CONSTRUCTION, EQUIPMENT, INSTALLATION, OPERATION AND MAINTENANCE OF A PHOTOVOLTAIC POWER PLANT IN THE STATE OF YUCATaN.

Sector: Electricity


Last Revision

February 01, 2024
 
Short Name of the Project:
0582 CENACE. 1st Long Term Power Auction (SLP-1/2015) Parque Eolico Ticul
Type of Investment:
Brownfield
Subsector:
Solar Power
Asset (s):
 Solar Farm 300 MW 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

8,928,000,000

Estimated Investment USD:

522,105,263

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
  Design,  Construction,  Equipment,  Installation,  Operation,  Maintenance

DESCRIPTION

The project consists of the design, construction, equipment, installation, operation and maintenance of “Ticul 1" photovoltaic power plant with a total production capacity of 300 MW in the state of Yucatan. The plant has the following features:
Power Zone: National
Export Subarea: “Peninsular”
Price Area: Merida
Interconnection Zone: TICUL II TIC-230

Vega Solar 1, was assigned the following contract through CENACE's 2015 long-term power auction:

Contract number: SLP2015010319-01 related to:
- Energy for 493,303 MWHr/Year during 15 years and issue Renewable Energy Certificates (CEL) for 483,515 CEL/Year during 20 years, with an offered price of MXN$487,075,849
Contract number: SLP2015010319-02 related to:
- Energy for 246,832 MWHr/Year during 15 years and issue Renewable Energy Certificates (CEL) for 241,935 CEL/Year during 20 years, with an offered price of MXN$249,047,032

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Private
Type of Contract
  Assignment
Term
15 years
Selection Process
Public Auction
Financing Sources
Private
100 %
MXN
8,928,000,000
USD
522,105,263
Payment Source
Project revenues / Rate
Electric Coverage Contract between “Suministro Básico” (Public Service Regulatory Entity) and the Generator.

STATUS

Stage
  Operation
Substage
  < 5 years of operation
RELEVANT DATES
Request for proposals/Announcement November 30, 2015
Proposals Reception January 20, 2016
Ruling March 31, 2016
Contract Signing July 12, 2016
Execution/Construction Starting Date September 01, 2018
Operation Starting Date September 07, 2020
Term of the Contract 2033
Contractor
Vega Solar 1  
Major Contractor’s Shareholders
Sunpower

GEOLOCATION

State(s)
Yucatan   

Entity in charge of controlling the possession of communal land, as well as providing documentary legal security derived from the application of the Agrarian Law, and is the operator of the Geospatial Information System (SIG).

SPONSOR

Responsive image
Entity
Private
Department
Vega Solar 1

SUSTAINABLE INFORMATION

PROJECT’S SUSTAINABILITY SUMMARY

The project promotes the energy transition and the region´s access to renewable energy sources.

* This summary was prepared based on the methodological framework defined by the Inter-American Development Bank (IDB) in the document entitled: “Attributes and Framework for Sustainable Infrastructure”, which is You can check Here.

Additionally, a brief explanation of the methodology and a summary of the questions applied can be consulted in this Document.

ADDITIONAL INFORMATION

Responsive image
Source
Secretaría de Medio Ambiente y Recursos Naturales
Description
Federal government entity and sectorial authority responsible for establishing the necessary criteria and instruments to guarantee the protection, preservation, and use of natural resources, by developing an environmental policy that ensures sustainable growth.
ID
31YU2016E0017
Permits
Responsive image
Source
Secretaría de Energía
Description
Federal Government entity responsible for controlling, managing and regulating Mexico’s energy resources, and establishing the national energy policy.
Responsive image
Source
Centro Nacional de Control de Energía
Description
Public entity whose objective is to exercise operational control over the national electric system and the operations of the wholesale electricity market, and to guarantee impartial access to the national transmission network and to the general distribution network
Responsive image
Source
Comisión Reguladora de Energía
Description
The Energy Regulatory Commission is an independent regulatory entity that fosters the efficient growth of the sector, as well as of a reliable power supply. Its mission is to regulate the activities of the power industry in a transparent, impartial, and efficient manner, in order to generate the required certainty that encourages productive investment, promotes healthy competition, and generates an adequate coverage of services.
ID
E/2052/GEN/2018
CRE Permit
ID
E/2053/GEN/2018
CRE Permit
Responsive image
Source
Secretaría de Energía
Description
Federal Government entity responsible for controlling, managing and regulating Mexico’s energy resources, and establishing the national energy policy.

REMARKS

Se considera inicio de operación la fecha de operación comercial que figura en los Títulos de Permisos E/2052/GEN/2018 y E/2053/GEN/2018.