Project
DESIGN, CONSTRUCTION, EQUIPMENT, INSTALLATION, OPERATION AND MAINTENANCE OF A WIND POWER PLANT IN THE STATE OF TAMAULIPAS.
Sector: Electricity
Last Revision
August 05, 2024
Power Auction:
Short Name of the Project:
0551 CENACE: 2nd Long Term Power Auction (SLP-1/2016) Reynosa III
Type of Investment:
Brownfield
Subsector:
Wind Power
Asset (s):
Wind Farms 431 MW
Contract Currency:
Mexican Pesos MXNEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Banobras/Fonadin involvement
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
Design, Construction, Equipment, Installation, Operation, Maintenance