Project
DESIGN, CONSTRUCTION, EQUIPMENT, INSTALLATION, OPERATION AND MAINTENANCE OF A PHOTOVOLTAIC POWER PLANT, IN THE STATE OF SONORA.
Sector: Electricity
Last Revision
October 25, 2024
Power Auction:
Short Name of the Project:
0548 CENACE: 2nd Long Term Power Auction (SLP 1/2016) Orejana
Type of Investment:
Brownfield
Subsector:
Solar Power
Asset (s):
Solar Farm 125 MW
Contract Currency:
Mexican Pesos MXNEstimated Investment MXN:
3,640,000,000
Estimated Investment USD:
212,865,497
Banobras/Fonadin involvement
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
Design, Construction, Equipment, Installation, Operation, Maintenance