Project
DESIGN, CONSTRUCTION, EQUIPMENT, INSTALLATION, OPERATION AND MAINTENANCE OF A HYDROELECTRIC POWER PLANT, IN THE STATE OF PUEBLA.
Sector: Electricity
Last Revision
October 25, 2024
Power Auction:
Short Name of the Project:
0547 CENACE: 2nd Long Term Power Auction (SLP 1/2016) Necaxa 8
Type of Investment:
Brownfield
Subsector:
Hydraulic Power
Asset (s):
Hydroelectric Power Plant 7 MW
Contract Currency:
Mexican Pesos MXNEstimated Investment MXN:
210,000,000
Estimated Investment USD:
12,280,701
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
Design, Construction, Equipment, Installation, Operation, Maintenance