Project
EXECUTION OF WORKS 1212: ELECTRICAL SUBSTATION, TRANSMISSION LINE, CAPACITOR AND TERMINAL EQUIPMENT IN THE STATE OF PUEBLA.
Sector: Electricity
Last Revision
October 25, 2024
Short Name of the Project:
0427 CFE: SE 1212 South-Peninsular (Phase 8)
Type of Investment:
Greenfield
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation 30 MVA, Electric Power Transmission Line 8 km-c, Capacitor 1.80 MVAr
Contract Currency:
US DollarsEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
Design, Construction, Equipment, Installation