Project
DESIGN, CONSTRUCTION, EQUIPMENT AND INSTALLATION OF AN ELECTRIC TRANSMISSION LINE AND TERMINAL EQUIPMENT IN THE STATE OF SINALOA.
Sector: Electricity
Last Revision
October 25, 2024
Short Name of the Project:
0416 CFE: Transmission Lines System 2120 Substations, Lines and Distribution Networks (Phase 4)
Type of Investment:
Greenfield
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation 30 MVA, Capacitor 1.80 MVAr
Contract Currency:
US DollarsEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
Design, Construction, Equipment, Installation