Project
EXECUTION OF WORKS 2020: ELECTRIC SUBSTATION AND TRANSMISSION LINE, IN THE STATE OF CHIAPAS
Sector: Electricity
Last Revision
October 25, 2024
Short Name of the Project:
0410 CFE: Transmission Lines System 2020 Substations, Lines and Distribution Networks (Phase 8)
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation 1, Electric Power Transmission Line 1
Contract Currency:
US DollarsEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
Design, Construction, Equipment, Installation