Project
EXECUTION OF WORKS 282: SUBSTATION AND TRANSMISSION LINE, IN THE STATE OF MEXICO.
Sector: Electricity
Last Revision
October 25, 2024
Short Name of the Project:
0396 CFE: Transmission Line System 1720 Distribution Valley of Mexico (2nd Phase)
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation, Electric Power Transmission Line
Contract Currency:
Mexican Pesos MXNEstimated Investment MXN:
609,089,042
Estimated Investment USD:
35,619,242
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
Design, Construction, Equipment, Installation