Project

CONSTRUCTION, CONSERVATION AND EXPLOITATION OF THE SAN MIGUEL BRIDGE, LOCATED OVER THE FUERTE RIVER OF THE MEXICO-NOGALES HIGHWAY, AS WELL AS THE LOS MOCHIS-TOPOLOBAMPO BYPASS, IN THE in the state of sinaloa.

Sector: Transport


Last Revision

December 16, 2024
 
Short Name of the Project:
0118 San Miguel Bridge and Los Mochis-Topolobampo Bypass
Type of Investment:
Brownfield
Subsector:
Highways / bridges
Asset (s):
 Bridge 0.25 KM, Highway 19.30 KM-A2, Highway 7 KM-A4 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
  Construction,  Conservation,  Exploitation

DESCRIPTION

ORIGINAL TITLE (Dec. 14, 1992). Construction, operation and maintenance of the 250 m long San Miguel Bridge expansion, located over the Fuerte River of the Mexico-Nogales Highway, on the Los Mochis-Estacion Don section of the highway, between the 16+384 km and the 16+644 km. The term of the concession is 17 years six months.
FIRST MODIFICATION (June 30, 2003). The term of the concession is extended to 30 years.
SECOND MODIFICATION (Dec. 17, 2004). The obligation to establish and maintain a security at updated value is eliminated.
THIRD MODIFICATION (June 14, 2022) (i) Modernize and conserve the toll plaza, reinforce and conserve the San Miguel Bridge, including complementary works to the bridge in 0.25 km; (ii) Rebuild different affected sections on the Benito Juárez highway, which connects Culiacán with the municipality of Angostura, Sinaloa; and (iii) Build, conserve and operate the Los Mochis - Topolobampo type A2 bypass with a crown width of 12 m, with a length of 19.3 km and, the modernization of the Los Mochis - Topolobampo type A4 state highway in 7 km.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Concession
Term
60 years
Payment Source
Project revenues / Rate
The project’s main source of payment are the toll fees collected by the concessionaire.

STATUS

Stage
  Operation
Substage
  > 5 years of operation
RELEVANT DATES
Contract Signing December 14, 1992
Term of the Contract December 13, 2052
Contractor
Gobierno del Estado de Sinaloa  

GEOLOCATION

State(s)
Sinaloa   

SPONSOR

Responsive image
Entity
Secretaría de Infraestructura, Comunicaciones y Transportes
Department
Dirección General de Desarrollo Carretero
Contact
Lic. Miguel Covarrubias Moreno / Director de Análisis Financiero de Concesiones
E-mail
miguel.covarrubias@sct.gob.mx

ADDITIONAL INFORMATION

Responsive image
Source
Secretaría de Infraestructura, Comunicaciones y Transportes
Description
Federal Government entity responsible for promoting adequate transport and communications networks to contribute to services accessibility, and cope with globalization trends.
Responsive image
Source
State Government
Responsive image
Source
Secretaría de Medio Ambiente y Recursos Naturales
Description
Federal government entity and sectorial authority responsible for establishing the necessary criteria and instruments to guarantee the protection, preservation, and use of natural resources, by developing an environmental policy that ensures sustainable growth.

Follow the Project

Leave your e-mail to receive updates on this Project.

 I have read and I accept the Privacy Notice