Project

CONSTRUCTION, OPERATION, MAINTENANCE, CONSERVATION AND EXPLOITATION OF THE MARAVATÍO-ZAPOTLANEJO Y GUADALAJARA-AGUASCALIENTES-LEÓN, TOLLS HIGH WAYS, IN THE STATES OF MICHOACaN, JALISCO, GUANAJUATO Y AGUASCALIENTES.

Sector: Transport


Last Revision

June 03, 2024
 
Short Name of the Project:
0098 Maravatio-Zapotlanejo and Guadalajara-Aguascalientes-Leon Highways
Type of Investment:
Brownfield
Subsector:
Highways / bridges
Asset (s):
 Highway 604 KM 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
  Construction,  Operation,  Maintenance,  Conservation,  Exploitation

DESCRIPTION

ORIGINAL TITLE (Oct. 3, 2007). Construc, operate, exploit, conserve and maintain the Maravatio-Zapotlanejo highways with a length of 309.7 kilometers, Guadalajara-Zapotlanejo of 26 km in length, Zapotlanejo-Lagos de Moreno of 118.5 km in length and León-Aguascalientes with a length of 103.8 km. Right of way and auxiliary services are included. Likewise, the expansion works associated with these highways are contemplated.
FIRST MODIFICATION (June 13, 2014). It includes the free-toll branch with a length of 46.0 km starting in the east of Jiquilpan, Michoacan, and termination at the junction with the Maravatio-Zapotlanejo highway at the height of km 405 + 400, as high-specification highway of type A2 with 12 m crown.
SECOND MODIFICATION (Jan. 31, 2020). Construct, maintain and conserve 3 toll-free highways: (i) Bypass of Lagos de Moreno (25 km), (ii) Ecuandureo-La Piedad (39.3 km), (iii) Zitácuaro-Maravatío (71.3 km), the project includes 79 junctions and 77 structures to be modernized. The term of the contract is extended for 6 years.
Included in a listed vehicle

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public / Private
Type of Contract
  Concession
Term
40 years
Selection Process
International Open Tender
Payment Source
Project revenues / Rate
The main project’s source of payment are the toll fees collected by the concessionaire.

STATUS

Stage
  Operation
Substage
  > 5 years of operation
RELEVANT DATES
Request for proposals/Announcement November 07, 2006
Ruling August 06, 2007
Contract Signing October 03, 2007
Term of the Contract April 02, 2048
Contractor
Red de Carreteras de Occidente  
Major Contractor’s Shareholders
Red de Carreteras de Occidente

GEOLOCATION

State(s)
Jalisco, Michoacan, Guanajuato, Aguascalientes   

The georeferenced map of this highway is approximate, considering the start and end points included in the concession titles and the National Road Network, using the Geospatial Information System (SIG for its acronym in Spanish), of the National Agrarian Registry. This link is published under the Terms and Conditions of this site.

SPONSOR

Responsive image
Entity
Secretaría de Infraestructura, Comunicaciones y Transportes
Department
Dirección General de Desarrollo Carretero
Contact
Fernando Palma Soto / Director General Adjunto de Seguimiento de Concesiones de Autopistas
E-mail
fpalmaso@sct.gob.mx

ADDITIONAL INFORMATION

Responsive image
Source
Secretaría de Infraestructura, Comunicaciones y Transportes
Description
Federal Government entity responsible for promoting adequate transport and communications networks to contribute to services accessibility, and cope with globalization trends.
Responsive image
Source
Secretaría de Medio Ambiente y Recursos Naturales
Description
Federal government entity and sectorial authority responsible for establishing the necessary criteria and instruments to guarantee the protection, preservation, and use of natural resources, by developing an environmental policy that ensures sustainable growth.
ID
16MI2022V0013
Permits, Maravatio-Zitacuaro
Responsive image
Source
Concessionaire / Related Company

Follow the Project

Leave your e-mail to receive updates on this Project.

 I have read and I accept the Privacy Notice