Project

CONSTRUCTION, EQUIPMENT, AND INSTALLATION OF THE NEW POTABLE WATER EXTRACTION ZONE FOR SUPPLY TO TULUM CITY, MUNICIPALITY OF TULUM, QUINTANA ROO

Sector: Water and Environment


Last Revision

December 04, 2024
 
Short Name of the Project:
0962 Potable Water Extraction Zone for the Supply to Tulum City
Type of Investment:
Greenfield
Subsector:
Water Supply
Asset (s):
 Onshore Wells 24 litres per second (l/s), Aqueduct 14,276.67 Mts 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

542,780,746

Estimated Investment USD:

31,741,564

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
  Construction,  Equipment,  Installation

DESCRIPTION

The project involves the construction, equipping, and installation of a new extraction zone with a maximum production capacity of up to 576 liters per second (l/s). The objective is to increase the production capacity of the potable water supply system, ensuring sufficient volumes and adequate quality to meet the needs of Tulum City's population.

The comprehensive project includes:

24 extraction wells with a 14-inch diameter and a depth of 30 meters, equipped with a multi-stage submersible motor-pump unit of 25 horsepower (Hp), designed for a flow rate of 24 liters per second (l/s) and a working pressure of 50 meters water column.
9.05 km of internal conduction lines to collect the flow rates produced by each extraction well and direct them to a main aqueduct.
14.276 km of main aqueduct for conveying the produced flow southward.
8.88 km of access roads, constructed through grading and leveling, clearing, stripping, and uprooting of terrain.
7 monitoring wells with a 14-inch diameter and a depth of up to 30 meters, equipped for measuring atmospheric pressure, temperature, and the water's electrical conductivity.
9.366 km of medium-voltage (35 kV) electrical supply lines, consisting of combined overhead-underground three-phase, four-wire systems, to provide power to the infrastructure in the new zone.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public

STATUS

Stage
  Preinvestment
Substage
  Studies
RELEVANT DATES
Ministry of Finance Registration or equivalent November 04, 2024

GEOLOCATION

State(s)
Quintana Roo   

SPONSOR

Responsive image
Entity
State Government
Department
Comisión de Agua Potable y Alcantarillado

ADDITIONAL INFORMATION

Responsive image
Source
Unidad de Inversiones (SHCP)
Description
Administrative office of the Ministry of Finance that, among other attributions, is responsible for concentrating and managing the pipeline of programs and projects submitted by the entities of the Federal Public Administration.
ID
2416B000033
Website

MULTIMEDIA

Gallery
QR Code

REMARKS

The project area covers a surface of 70 hectares and is located within the 3105 "Yucatán Peninsula" Aquifer, which is classified as "Not Overexploited," with a positive average annual availability or no deficit (2,059.63 hm³).