Project
EXECUTION OF WORKS: ELECTRICAL SUBSTATIONS AND TRANSMISSION LINES, IN THE STATES OF Hidalgo and San Luis Potosí.
Sector: Electricity
Last Revision
February 14, 2025
Short Name of the Project:
0957 CFE: 352 SLT Transformation and transmission Querétaro, Isla del Carmen, Nuevo Casas Grandes and La Huasteca (Phase 4 Las Mesas)
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
Electric Power Transmission Line 2, Power Station /Electrical Substation 4
Contract Currency:
US DollarsEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
Design, Construction, Equipment, Installation