Project

EXECUTION OF WORKS: ELECTRICAL SUBSTATIONS AND TRANSMISSION LINES, IN THE STATES OF Hidalgo and San Luis Potosí.

Sector: Electricity


Last Revision

February 14, 2025
 
Short Name of the Project:
0957 CFE: 352 SLT Transformation and transmission Querétaro, Isla del Carmen, Nuevo Casas Grandes and La Huasteca (Phase 4 Las Mesas)
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
 Electric Power Transmission Line 2, Power Station /Electrical Substation 4 
Contract Currency:
US Dollars
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
  Design,  Construction,  Equipment,  Installation

DESCRIPTION

The project consists of the execution of the following works:
- 4 substations with voltage of 115 kV and 400 kV, with a total transformation capacity of 300 MVA: Las Mesas Bco. 1, Axtla Extension, Huejutla II Extension, Huasteca Extension;
- 2 transmission lines with voltage of 115 kV and a total length of 54.7 km-Line and 63.3 km-Circuit: LT Las Mesas - Huejutla II, LT Las Mesas Entq. Axtla - Tamazunchale;
- 6 feeders.

The works include the following concepts within their scope: supply of equipment and materials for permanent installation, development of engineering associated with electromechanical and civil design concepts, execution of electromechanical and civil works, performance of pre-operational tests, as well as the preparation, analysis and evaluation of the required studies (geotechnical studies, topographic surveys, census of underground facilities and apparent electrical resistivity of the terrain) and the delivery of training and coaching programs.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Financed Public Works
Selection Process
International Open Tender
Financing Sources
Private
100 %
MXN
N.A.
USD
N.A.
Payment Source
Budgetary

STATUS

Stage
  Bidding
Substage
  Proposal Development
RELEVANT DATES
Request for proposals/Announcement February 13, 2025
Proposals Reception March 26, 2025
Ruling April 24, 2025
Contract Signing May 09, 2025
Execution/Construction Starting Date May 10, 2025
Term of the Contract October 31, 2026

GEOLOCATION

State(s)
Hidalgo, San Luis Potosi   

SPONSOR

Responsive image
Entity
Comisión Federal de Electricidad
Department
Subdirección de Contratación y Servicios
Contact
Mtro. Héctor Omar Leal Nava
E-mail
gcia.contratacionesdeobra@cfe.mx

ADDITIONAL INFORMATION

Responsive image
Source
Comisión Federal de Electricidad
Description
State owned productive company involved in power generation, transmission, distribution, commercialization and supply activities.
ID
CFE-0003-CACOA-0002-2025
Tender

REMARKS

A turnkey lump-sum contract will be executed, with a maximum contract amount of USD $36,109,305.78. No advance payment will be granted.

Project ID: 2053TVV0001.

Follow the Project

Leave your e-mail to receive updates on this Project.

 I have read and I accept the Privacy Notice