Project

DESIGN, CONSTRUCTION, EXPLOITATION, OPERATION, CONSERVATION AND MAINTENANCE OF THE MACROLIBRATION IN THE SOUTH OF COLIMA

Sector: Transport


Last Revision

April 15, 2024
Short Name of the Project:
0945 South Macro-bypass of Colima
Type of Investment:
Greenfield
Subsector:
Highways / bridges
Asset (s):
 Highway 28.80 KM-A4 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

4,862,858,000

Estimated Investment USD:

284,377,660

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
  Design,  Construction,  Operation,  Maintenance,  Conservation,  Exploitation

DESCRIPTION

The Project consists of the design, construction, exploitation, operation, conservation and maintenance of the Macrolibrary in the South of Colima, with a type A4 section, a crown width of 22.0 m, 4 circulation lanes (2 in each direction) of 3.5 m each one, exterior shoulders of 3.0 m, interior shoulders of 1.0 m and an approximate length of 28.8 km.

The Project considers the intervention of two sections:

A. Section 1 (km 0+000 to km 22+800): New section with a crown width of 22.0 m and a type A4 section, which considers 4 traffic lanes (2 in each direction) of 3.5 m width each, exterior shoulders of 3.0 m, interior shoulders of 1.0 m, in a length of 22.8 km, including the construction of 6 crossings (lower/upper), 1 crossing over railway tracks, 2 toll plazas located at the ends of the Section with 4 lanes and booths, 4 bridges (3 on the trunk and 1 at the Jiquilpan junction), 1 initial uneven junction that will connect the vicinity of km 8+000, of the Free Federal Highway Colima – Tecomán Junction (MEX-110) and 1 junction in the Jiquilpan area that will connect the project with the current roads in the Altamira community.

B. Section 2 (22+800 to km 28+800): Extension of the existing highway that begins at the town of Buenavista and ends at the intersection of the Federal Toll Highway Guadalajara – Colima (MEX-054D) and the Free Federal Highway Cd. Guzmán - Colima (MEX-054), to take it from a type A2 section (one lane of traffic in each direction) to a type A4 section, in a length of 6.0 km, including the construction of 1 uneven junction, to connect the National Airport of Colima with the South Macrolibration, and 1 junction with the Guadalajara Colima highway.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public / Private
Type of Contract
  State PPP
Term
30 years
Selection Process
Open Domestic Bidding
Payment Source
Project revenues / Rate
The main source of payment is the toll fees charged by the concessionaire.

STATUS

Stage
  Execution
RELEVANT DATES
Request for proposals/Announcement December 22, 2023
Proposals Reception January 22, 2024
Ruling February 02, 2024
Execution/Construction Starting Date February 20, 2024
Operation Starting Date June 2026
Contractor
MacroSur Colima  
Major Contractor’s Shareholders
Recsa Concesiones, Recsa Equity, Promotora y Operadora de Infraestructura, Grupo Concesionario de Mexico, Concesionaria de Servicios Publicos

GEOLOCATION

State(s)
Colima   

SPONSOR

Responsive image
Entity
State Government
Department
Gobierno del estado de Colima
Secretaría de Infraestructura, Desarrollo Urbano y Movilidad
Contact
Arq. Marisol Neri León

ADDITIONAL INFORMATION

Responsive image
Source
State Government
ID
SEIDUM-PAPP-001/2023
Tender website Call
Feasibility opinion
Responsive image
Source
Mexican Stock Exchange

REMARKS

The Project originates from the presentation of the PNS (Unsolicited Proposal) promoted by the companies Recsa Concesiones, S.A.P.I. of C.V. and Concesionaria de Servicios Públicos, S.A. de C.V., in writing dated September 20, 2023.