Project
EXECUTION OF WORKS 245: ELECTRICAL SUBSTATION AND TRANSMISSION LINES, IN THE STATE OF SINALOA.
Sector: Electricity
Last Revision
April 01, 2025
Short Name of the Project:
0941 CFE: 246 SE 1320 Northwest Distribution (6th phase)
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation 115 KV, Electric Power Transmission Line 115 KV, Electric Power Transmission Line 115 KV
Contract Currency:
US DollarsEstimated Investment MXN:
432,589,074
Estimated Investment USD:
23,383,193
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
Design, Construction, Equipment, Installation