Project
EXECUTION OF WORKS 245: ELECTRICAL SUBSTATION AND TRANSMISSION LINES, IN THE STATE OF SINALOA.
Sector: Electricity
Last Revision
October 25, 2024
Short Name of the Project:
0941 CFE: SE 1320 Northwest Distribution (6th phase)
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation, Electric Power Transmission Line 2
Contract Currency:
US DollarsEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
Design, Construction, Equipment, Installation