Project

EXECUTION OF WORKS 245: ELECTRICAL SUBSTATION AND TRANSMISSION LINES, IN THE STATE OF SINALOA.

Sector: Electricity


Last Revision

October 25, 2024
 
Short Name of the Project:
0941 CFE: SE 1320 Northwest Distribution (6th phase)
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
 Power Station /Electrical Substation, Electric Power Transmission Line 2 
Contract Currency:
US Dollars
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
  Design,  Construction,  Equipment,  Installation

DESCRIPTION

The project consists of the execution of the following works:

- 1 substation with a voltage of 115 kV, with 1 feeder, ROSARIO (EXTENSION); and
- 2 transmission lines with a voltage of 115 kV and a total length of 68.5 km-Line and 78.1 km-Circuit, LT VILLA UNION - ROSARIO and LT ROSARIO - ESCUINAPA.

The works include the following concepts: supply of equipment and materials for permanent installation, development of engineering associated with electromechanical and civil design concepts, execution of electromechanical and civil works, pre-operational testing, as well as the preparation, analysis and evaluation of required studies (geotechnical studies, topographic surveys, census of underground installations, and resistivity) and the implementation of training and education programs

The project is defined as a turnkey contract at a fixed price, no advance will be granted.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Financed Public Works
Selection Process
International Open Tender
Financing Sources
Private
100 %
MXN
N.A.
USD
N.A.
Payment Source
Budgetary

STATUS

Stage
  Preinvestment
Substage
  Preparation
RELEVANT DATES

GEOLOCATION

State(s)
Sinaloa   

SPONSOR

Responsive image
Entity
Comisión Federal de Electricidad
Department
Subdirección de Contratación y Servicios
Contact
Mtra. Erika Alejandra Enciso Macías
E-mail
gcia.contratacionesdeobra@cfe.mx

ADDITIONAL INFORMATION

Responsive image
Source
Comisión Federal de Electricidad
Description
State owned productive company involved in power generation, transmission, distribution, commercialization and supply activities.

REMARKS

The previous contest CFE-0003-CACOA-0002-2024 was declared void on May 17, 2024.