EXECUTION OF WORKS 280: SUBSTATIONS AND TRANSMISSION LINE, IN THE STATE OF SINALOA.
Sector: Electricity
Last Revision
April 09, 2024
Short Name of the Project:
0939 CFE: Transmission Line System 280 North Distribution 6th phase
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation 2, Electric Power Transmission Line
Contract Currency:
Mexican Pesos MXNEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
Design, Construction, Equipment, Installation