Project
EXECUTION OF WORKS 358: SUBSTATIONS AND TRANSMISSION LINES IN THE STATES OF SAN LUIS POTOSI, HIDALGO AND THE STATE OF MEXICO.
Sector: Electricity
Last Revision
October 25, 2024
Short Name of the Project:
0937 CFE: SLT 358 Increase in transmission capacity in the northeast and central part of the country stage 3
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation 3, Electric Power Transmission Line 4
Contract Currency:
US DollarsEstimated Investment MXN:
1,840,951,800
Estimated Investment USD:
107,658,000
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
Design, Construction, Equipment, Installation