Project
EXECUTION OF WORKS 359: SUBSTATIONS AND TRANSMISSION LINES, IN THE STATES OF SINALOA AND NAYARIT.
Sector: Electricity
Last Revision
October 25, 2024
Short Name of the Project:
0934 CFE: Transmission Line System 359 Congestion solution for northwest, west and north GCR transmission links phase 2 stage 3
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation 3, Electric Power Transmission Line 2
Contract Currency:
Mexican Pesos MXNEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
Design, Construction, Equipment, Installation