Project
EXECUTION OF PROJECT 359: SUBSTATIONS AND TRANSMISSION LINE, IN THE STATE OF SINALOA.
Sector: Electricity
Last Revision
October 25, 2024
Short Name of the Project:
0933 CFE: SLT 359 Solution to Transmission Link Congestion in GCR Northwest, West and North, Phase 2, Stage 2
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation 2, Electric Power Transmission Line 1
Contract Currency:
US DollarsEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
Design, Construction, Equipment, Installation