Project

EXECUTION OF WORKS (TRANSMISSION LINES AND SUBSTATIONS) OF THE PROJECT TO REDUCTION IN THE SHORT CIRCUIT LEVEL OF THE ELECTRICAL NETWORK OF THE METROPOLITAN AREA OF MONTERREY, IN THE STATE OF NUEVO LEÓN.

Sector: Electricity


Last Revision

October 25, 2024
 
Short Name of the Project:
0926 CFE: Reduction in the short circuit level of the electrical network of ZM de Monterrey
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
 Power Station /Electrical Substation 26, Electric Power Transmission Line 8 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

1,484,942,893

Estimated Investment USD:

86,838,765

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
  Design,  Construction,  Equipment,  Installation

DESCRIPTION

The project consists of the execution of the following works:
- 8 transmission lines with voltages of 115 kV and 400 kV, with a total length of 6.27 km-line and 12.35 km-Circuit,
- 1 new 400 kV/115 kV SF6 electrical substation in S.E Santo Domingo Potencia,
- 8 electrical substations for the replacement of 115 kV switches,
- 16 electrical substations for the replacement of 115 kV Current Transformers and
- 1 electrical substation for the replacement of a 115 kV Current Limiting Reactor.

These works include within their scope the following concepts: supply of equipment and materials for permanent installation, development of engineering associated with the concepts of electromechanical and civil design, execution of electromechanical and civil works, performance of pre-operational tests, as well as the preparation, analysis and evaluation of the required studies (geotechnical studies, topographic surveys, electrical resistivity, thermal resistivity and census of underground facilities) and the delivery of training and training programs.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Public Works
Selection Process
International Open Tender
Payment Source
Budgetary
The budgetary resources to fulfill the obligations arising from the execution of the Contract are found in the SAP System, in accordance with Solcon number 700202724.

STATUS

Stage
  Execution
RELEVANT DATES
Request for proposals/Announcement October 31, 2023
Proposals Reception November 30, 2023
Ruling December 14, 2023
Contract Signing December 22, 2023
Execution/Construction Starting Date December 26, 2023
Term of the Contract August 17, 2025
Contractor
Aselec Electricidad, Luxe Tower  

GEOLOCATION

State(s)
Nuevo Leon   

SPONSOR

Responsive image
Entity
Comisión Federal de Electricidad
Department
Subdirección de Contratación y Servicios
Contact
Mtra. Erika Alejandra Enciso Macías
E-mail
alejandra.encisom@cfe.mx

ADDITIONAL INFORMATION

Responsive image
Source
Comisión Federal de Electricidad
Description
State owned productive company involved in power generation, transmission, distribution, commercialization and supply activities.
ID
CFE-0003-CACOA-0010-2023
Tender

REMARKS

Start date and execution period according to what is established in the ruling.

Follow the Project