Project

Execution of Works 359: Substations in the States of Sonora, Chihuahua, Sinaloa, and Zacatecas.

Sector: Electricity


Last Revision

October 25, 2024
 
Short Name of the Project:
0922 CFE: SLT 359 Transmission link congestion solution (phase 1)
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
 Power Station /Electrical Substation 4 
Contract Currency:
US Dollars
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
  Construction

DESCRIPTION

The project consists of the execution of the following infrastructure works:
- Seri electric substation of static synchronous compensator, in the state of Sonora.
- Nuevo Casas Grandes static synchronous compensator electric substation, in the state of Chihuahua.
- Mazatlan II static synchronous compensator electric substation, in the state of Sinaloa.
- Primero de Mayo static synchronous compensator electric substation, in the state of Zacatecas.

The scope of the works includes the following concepts: supply of equipment and materials for permanent installation, development of engineering associated with electromechanical and civil design concepts, execution of electromechanical and civil works, pre-operational testing, preparation, analysis, and evaluation of required studies (geotechnical studies, topographic surveys, census of underground installations, and apparent electrical resistivity of the terrain) and the implementation of training and education programs.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Public Works
Term
2 years
Selection Process
International Open Tender
Financing Sources
Public Trust
100 %
MXN
N.A.
USD
N.A.
The resources come from the Administration and Payment Source Trust number F/1320.

STATUS

Stage
  Preinvestment
Substage
  Preparation
RELEVANT DATES

GEOLOCATION

State(s)
Chihuahua, Sinaloa, Sonora, Zacatecas   

SPONSOR

Responsive image
Entity
Comisión Federal de Electricidad
Department
Subdirección de Contratación y Servicios
Contact
Antonio González Barrascout
E-mail
antonio.gonzalez09@cfe.gob.mx

ADDITIONAL INFORMATION

Responsive image
Source
Comisión Federal de Electricidad
Description
State owned productive company involved in power generation, transmission, distribution, commercialization and supply activities.

REMARKS

The previous contest CFE-0003-CACOA-0009-2023 was declared void on 04/08/2024.