Project

DESIGN, EXECUTIVE PROJECT, CONSTRUCTION, EQUIPMENT AND OPERATION OF THE INTEGRAL MOBILITY MODEL OF THE SOUTH ZONE OF THE METROPOLITAN AREA OF GUADALAJARA (LINE 4), IN THE STATE OF JALISCO.

Sector: Transport


Last Revision

October 21, 2024
 
Short Name of the Project:
0914 Integral Mobility Model of the South Zone of the Metropolitan Area of Guadalajara (Line 4)
Type of Investment:
Greenfield
Subsector:
Urban Mobility
Asset (s):
 Electrified double track 21.16 KM, Electric Train 12, Stations 8, Control and Collection System 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

11,281,000,000

Estimated Investment USD:

659,707,602

Banobras, Fonadin involvement Banobras/Fonadin involvement

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
  Design,  Construction,  Equipment,  Operation

DESCRIPTION

PPP, co-investment modality for up to 38 years: Design, executive project, construction, equipment and operation of system of urban electric train type, to be developed within the general railroad communication track, corresponding to line I, within the concessioned right-of-way, between km I-266+500 and km I-287+667, with an approximate length of 21.16 kilometers.

Main characteristics:
• Origin: Las Juntas in the limits of Guadalajara and San Pedro Tlaquepaque;
• Destination: Tlajomulco de Zúñiga;
• Line operator: SITEUR (Urban Electric Train System);
• Layout:
- Passenger track: double and new. Tracks should be parallel to the freight track and deployed within the existing right-of-way. 115 lb/yd rail, 1% maximum grade and minimum in-line curvature radius of 286.48 m (1,000 ft).
- Freight track: single, existing track.
- Type of track: gauge compatible with regulation with regulatory law of rail service.
• Stations: 8
• Power supply:
- CFE electrical capacity: 60 Megavolt amperes Mva;
- Traction substations: 6 and 7 of 2.15-2.5 Mw (depending on whether the catenary supplies 750 or 1500 Vdc);
- Estimated demand for CFE: 6 Mw;
• Control center: In the yard and workshops of line 4, which will be located in the municipal capital of the municipality of Tlajomulco de Zúñiga.
• Collection: integration with the Mi Transporte collection system.
• Signaling: fiber optic network, redundancy with radio communication, direct telephony (Pbx), passenger information system, signaling and digital train control systems, MDF (main site), access network (horizontal cabling), IDF's in stations, video surveillance system (CCTV), paging system in stations.

Completion in two periods and three stages.

FIRST AMENDING AGREEMENT (Nov. 18, 2022). SECOND AMENDMENT AGREEMENT (Sep. 01, 2023). THIRD AMENDING AGREEMENT (Oct. 4, 2023). FOURTH AMENDING AGREEMENT (Aug. 03, 2023). FIFTH AMENDMENT AGREEMENT (Oct. 02, 2023). SIXTH AMENDING AGREEMENT (Nov. 15, 2023). SEVENTH AMENDING AGREEMENT (Dec. 7, 2023).

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public / Private
Type of Contract
  State PPP
Term
38 years
Selection Process
Open Domestic Bidding
Financing Sources
FONADIN
17.729 %
MXN
2,000,008,490
USD
116,959,561
State
18.616 %
MXN
2,100,070,960
USD
122,811,167
Private
63.655 %
MXN
7,180,920,550
USD
419,936,874
Payment Source
Project revenues / Rate
The contribution comes from the income of the collection system.

STATUS

Stage
  Execution
RELEVANT DATES
Request for proposals/Announcement August 16, 2022
Proposals Reception September 21, 2022
Ruling October 05, 2022
Contract Signing October 25, 2022
Execution/Construction Starting Date October 25, 2022
Operation Starting Date April 25, 2025
Term of the Contract October 24, 2060
Contractor
Consorcio Tren Ligero Línea 4 Guadalajara  
Major Contractor’s Shareholders
Mota-Engil México, Consorcio Tren Ligero Línea 4 Guadalajara

GEOLOCATION

State(s)
Jalisco   

SPONSOR

Responsive image
Entity
State Government
Department
Comité Estatal de Adjudicación de Proyectos
Sistema de Tren Eléctrico Urbano (SITEUR), Jalisco
Contact
Ing. Juan Carlos Holguín Aguirre
E-mail
proyecto.linea4@jalisco.gob.mx

SUSTAINABLE INFORMATION

PROJECT’S SUSTAINABILITY SUMMARY

The project purpose is to improve the connectivity for the population towards the South of metropolitan area of Guadalajara to Tlajomulco de Zúñiga to cover a demand of 117 thousand daily trips, through the operation of an electric train system. It is considered in the coordination strategy of mass public transport and CO2 emissions reduction. The project includes ecothecniques and the gender perspective.

* This summary was prepared based on the methodological framework defined by the Inter-American Development Bank (IDB) in the document entitled: “Attributes and Framework for Sustainable Infrastructure”, which is You can check Here.

Additionally, a brief explanation of the methodology and a summary of the questions applied can be consulted in this Document.

ADDITIONAL INFORMATION

Responsive image
Source
Unidad de Inversiones (SHCP)
Description
Administrative office of the Ministry of Finance that, among other attributions, is responsible for concentrating and managing the pipeline of programs and projects submitted by the entities of the Federal Public Administration.
ID
20093110005
Website
Responsive image
Source
Social Witness
Description
Figure who oversees that throughout a bidding procedure the current law is complied with, as a mechanism to strengthen transparency and minimize risks of opacity and corruption in government contracting.
Responsive image
Source
Fonadin
Description
National Infrastructure Fund that supports the development of communications, transport, water, environmental and tourism sectors by providing grants, venture capital, subordinated debt, credit and guarantees for the design and execution of high impact infrastructure projects.

REMARKS

The tender for this joint venture project is derived from the acceptance by the Government of the State of Jalisco of an Unsolicited Proposal (UP) submitted by Mota-Engil México, S.A.P.I. of C.V. to SITEUR.

The investment amount is as indicated on the Fonadin site.

Follow the Project