Project
DESIGN, EXECUTIVE PROJECT, CONSTRUCTION, EQUIPMENT AND OPERATION OF THE INTEGRAL MOBILITY MODEL OF THE SOUTH ZONE OF THE METROPOLITAN AREA OF GUADALAJARA (LINE 4), IN THE STATE OF JALISCO.
Sector: Transport
Last Revision
March 31, 2025
Short Name of the Project:
0914 Integral Mobility Model of the South Zone of the Metropolitan Area of Guadalajara (Line 4)
Type of Investment:
Greenfield
Subsector:
Urban Mobility
Asset (s):
Electrified double track 21.16 KM, Electric Train 12, Stations 8, Control and Collection System
Contract Currency:
Mexican Pesos MXNEstimated Investment MXN:
11,281,000,000
Estimated Investment USD:
609,783,783
Banobras/Fonadin involvement
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
Design, Construction, Equipment, Operation