Project

DESIGN, CONSTRUCTION, EQUIPMENT, OPERATION, CONSERVATION AND MAINTENANCE OF THE "EL AHOGADO" WASTEWATER TREATMENT PLANT EXPANSION, IN THE STATE OF JALISCO.

Sector: Water and Environment


Last Revision

March 04, 2024
Short Name of the Project:
0912 Expansion of the “El Ahogado” WWTP
Type of Investment:
Greenfield
Subsector:
Water sanitation
Asset (s):
 Wastewater Treatment Plant 1,000 litres per second (l/s) 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

1,157,075,985

Estimated Investment USD:

67,665,262

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
  Design,  Construction,  Equipment,  Operation,  Maintenance,  Conservation

DESCRIPTION

The Expansion of the “El Ahogado” WWTP includes the design, construction, electromechanical equipment, performance and capacity tests, operation, conservation and maintenance of the necessary infrastructure to expand the biological treatment with nutrient removal in a design flow of 1,000 liters per second (l/s).
In addition, includes the filtration and disinfection with ozone of a flow of 3,250 liters per second (l/s), corresponding to the 2,250 liters per second (l/s) currently being treated in the WWTP “El Ahogado” and the 1,000 liters per second (l/s) of the extension; as well as the removal and final disposal of biosolids and solids generated in the monofill.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public / Private
Type of Contract
  State PPP
Term
20 years
Selection Process
Open Domestic Bidding
Financing Sources
Private
100 %
MXN
1,157,075,985
USD
67,665,262
Payment Source
Rate
The payment of the total contribution to the supplying investor will be made with resources from the State Water Commission of Jalisco.

STATUS

Stage
  Execution
RELEVANT DATES
Request for proposals/Announcement August 04, 2022
Proposals Reception September 14, 2022
Ruling October 05, 2022
Contract Signing October 25, 2022
Execution/Construction Starting Date November 25, 2023
Operation Starting Date January 2025
Contractor
Mitsui & Co. Infrastructure Solutions  
Major Contractor’s Shareholders
Mitsui & Co., LTD

GEOLOCATION

State(s)
Jalisco   

SPONSOR

Responsive image
Entity
State Government
Department
Comisión Estatal del Agua del Estado de Jalisco
Contact
Ing. Carlos Vicente Aguirre Phczka.
E-mail
proyecto.elahogado@jalisco.gob.mx

SUSTAINABLE INFORMATION

PROJECT’S SUSTAINABILITY SUMMARY

The purpose of the project is the sanitation of the El Ahogado basin through the modernization of the disinfection system and the expansion of the WWTP with 1,000 lps for the treatment of wastewater emitted in the metropolitan area of Guadalajara, benefiting more than 5.2 million inhabitants. It considers the use of biosolids for the generation of electricity.

* This summary was prepared based on the methodological framework defined by the Inter-American Development Bank (IDB) in the document entitled: “Attributes and Framework for Sustainable Infrastructure”, which is You can check Here.

Additionally, a brief explanation of the methodology and a summary of the questions applied can be consulted in this Document.

ADDITIONAL INFORMATION

Responsive image
Source
State Government
Responsive image
Source
Secretaría de Medio Ambiente y Recursos Naturales
Description
Federal government entity and sectorial authority responsible for establishing the necessary criteria and instruments to guarantee the protection, preservation, and use of natural resources, by developing an environmental policy that ensures sustainable growth.
ID
14JA2022H0074
Permits
Responsive image
Source
Social Witness
Description
Figure who oversees that throughout a bidding procedure the current law is complied with, as a mechanism to strengthen transparency and minimize risks of opacity and corruption in government contracting.

Follow the Project

Leave your e-mail to receive updates on this Project.

 I have read and I accept the Privacy Notice