Project

INTEGRAL MODERNIZATION OF THE TRAINS, CONTROL SYSTEM AND TRACKS OF LINE 1 OF THE COLLECTIVE TRANSPORTATION SYSTEM

Sector: Transport


Last Revision

March 01, 2025
 
Short Name of the Project:
0891 Integral Modernization of Trains, Control System and Tracks of Line 1 of the Collective Transportation System
Type of Investment:
Brownfield
Subsector:
Urban Mobility
Asset (s):
 Subway Line 30 Trains, Roads, Electrical and Electronic Systems, Control System (Automatic Piloting) 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

16,574,016,793

Estimated Investment USD:

895,892,799

Banobras, Fonadin involvement Banobras/Fonadin involvement

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
  Design,  Construction,  Modernization,  Equipment,  Installation,  Maintenance

DESCRIPTION

The project consists of the modernization of Line 1 "Pantitlan - Observatorio" of the Collective Transport System (STC) through 3 components:

1. Trains Services:
a) Supply and commissioning of a batch of 29 new trains. Each train will have 9 pneumatic rolling cars and must meet the specifications and technical requirements determined by the STC.
b) Maintenance and conservation:
- Lot of 29 new trains.
- Lot of 10 existing trains NM16 (recently acquired).

2. Routes Services:
a) Renewal of tracks and electrical and electronic systems. Replacement of track elements (including rail, track, guide bar, different types of sleepers, track change, guide bar support insulators, ballast and insulating joints), as well as track alignment and leveling. Likewise, the substitution of the facilities of other specialties attached to the road is considered (such as self-piloting wooden tapestry supports, inductive connection antennas, electric bridges, earth system and cables in the rectification substations).
b) Maintenance and conservation.

3. Control System Services:
a) Supply and commissioning of a new control system. The current automatic piloting system (PA 135) is replaced by one of the “Continuous Telecommunications Base Train Control” (CBTC) type, whose standard is defined by the Institute of Electrical and Electronic Engineering (IEEE). In addition, it includes the supply of equipment for the restoration of the Centralized Control Post for Lines 1 to 6 of the Collective Transport System.
b) Maintenance and conservation of the CBTC control system.

The term of the service provision contract (PPS) is as follows: 3.5 years of implementation that concludes with the start-up of the last of the 29 new trains. Later the validity of services: they are 7 years for the maintenance and maintenance of trains and tracks and 15 years for the maintenance and conservation of the control system.

The objectives of the project are: Increase the transport capacity of users, increase the quality of service, reduce travel times, increase the frequency of trains, reduce maintenance costs and decrease the consumption of electrical energy.

(*) Project with Banobras and/or National Infrastructure Fund (Fonadin) involvement or support.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public / Private
Type of Contract
  Provision of services
Term
19 years
Selection Process
International Open Tender
Financing Sources
Private
100 %
MXN
16,574,016,793
USD
895,892,799
Payment Source
Budgetary
The Collective Transportation System will pay the developer a consideration for the services provided from its budget. Mexico City acts as a source of alternate payment and / or guarantee of the PPS of the resources derived from present and future federal participations that correspond to it from the General Participation Fund.

STATUS

Stage
  Operation
Substage
  < 5 years of operation
RELEVANT DATES
Request for proposals/Announcement June 18, 2020
Proposals Reception October 27, 2020
Ruling November 27, 2020
Contract Signing December 18, 2020
Execution/Construction Starting Date July 09, 2022
Operation Starting Date 2025
Term of the Contract 2039
Contractor
MEXIRRC  
Major Contractor’s Shareholders
CRRC Zhuzhou Locomotive Co., CRRC (Hong Kong) Co.

GEOLOCATION

State(s)
Mexico City   

SPONSOR

Responsive image
Entity
Gobierno de la Ciudad de México
Department
Sistema de Transporte Colectivo
Dirección de Finanzas
Contact
Mtro. Nevid Antonio Torres Lezama
E-mail
direccionfinanzas@metro.cdmx.gob.mx

SUSTAINABLE INFORMATION

PROJECT’S SUSTAINABILITY SUMMARY

The purpose of the project is the provision of services for the modernization of the track service, new trains and control systems of Line 1 Pantitlán-Observatory of the Collective Transport System of Mexico City, in order to increase the service capacity of public transport. Considers the introduction of new technologies, including energy efficiency.

* This summary was prepared based on the methodological framework defined by the Inter-American Development Bank (IDB) in the document entitled: “Attributes and Framework for Sustainable Infrastructure”, which is You can check Here.

Additionally, a brief explanation of the methodology and a summary of the questions applied can be consulted in this Document.

REMARKS

Since Oct. 29, 2023, the section from Pantitlán to Isabel La Católica has been in operation.

According to the Fifth Modifying Agreement, the scheduled completion date of the implementation phase is Dec. 18, 2025.According to the Fifth Modifying Agreement, the scheduled completion date of the implementation phase is Dec. 18, 2025.