Tender for Comprehensive Mobility Model for the South Zone of the Guadalajara Metropolitan Area (Line 4)
Line 4 will be the first passenger transport route in Mexico to be incorporated into the freight train right of way; It will have 8 stations in 21 km and will initially move 106 thousand daily users.
It will provide a solution to move and connect the inhabitants of Tlajomulco with the rest of the AMG.
Source: Government of Jalisco / Mi Tren Linea 4